Project Site: Shanxi, China
Construction Company: Shanxi Fracturing Proppants Public Limited Company
Product: Proppant
Production Capacity: 100,000 tons per year
Supply Scope: Process design, equipment supply and equipment installation from powder material storage, ingredient blending to final product packing system, dust collecting system, and electrical automatic control system.
Project Brief
Shanxi Fracturing Proppants Public Limited Company is located in the Small and medium-sized enterprise startup hubs of Yuanqu country. It has research and development, production and sales and marketing services as one of the joint-stock enterprises . The main product is proppant. It is specially used in the petroleum industry. It is used for petroleum (gas) well exploitation and petroleum (gas)fracturing technology to realize petroleum (gas) high production capacity to extend the petroleum (gas) well long time using life. Shanxi Fracturing Proppants Public Limited Company has owned 5 rotary kiln production lines. It has the production capacity of 120,000 tons per year to produce the proppant with different model. Shanxi Fracturing Proppants Public Limited Company developing idea is to extend the produciton capacity, be stronger and bigger, building brand to occupy international market. So it has decided to build a new proppant production line with capacity of 100,000 ton per year.
Shanxi Fracturing Proppants Public Limited Company
Project Implementation
In July of 2013. Shanxi Fracturing Proppants Public Limited Company had begun the deep investigation on the proppant equipment manufacturers. After widely investigation and comparing, they finally confirm Henan Zhengzhou Mining Machinery Co.,Ltd as the EPC contractor to do production design, equipment supply, installation and commissioning. Both parties had signed the contract in March, 2014.When contract become effective, we have founded the project headquarters to perform 4S management system strictly. Product design, equipment manufacturing, quality inspection and packing should abide the industry standard or company technical standard.
We set project department in the construction site. there are project manager, process engineer, equipment design engineer, material person, quality inspector and other technical persons to make conversation with owner’s project department in time.
After the closed cooperation and active forwarding. the project has started the load production capacity in May, 2015.
Proppant Production Line Raw Material Calcination System
Proppant Production Line Environment Dust Collecting System
Main Supplied Equipment List
Model | Equipment Name | Equipment Model | Qty. | System |
1 | Powder Mixer | ZKH-19 | 2 | Ingredient Blending System |
2 | Primer Machine | ZK-15 | 2 | Granulating System |
3 | Granulator Machine | ZKY-42 | 6 | Granulating System |
4 | Dryer | HJ2018 | 1 | Drying System |
5 | Rotary Kiln | Φ3.2×60 | 1 | Burning System |
6 | Rotary Cooler | Φ2.3×25 | 1 | Burning System |
7 | Packing Machine |
| 3 | Final Product Packing System |